Optimization of resources by real-time correlation study for maximizing the productivity

dc.contributor.authorAgrawal, A.
dc.contributor.authorDas, B.B.
dc.contributor.authorMalik, S.K.
dc.date.accessioned2026-02-08T16:50:34Z
dc.date.issued2019
dc.description.abstractTime and cost are two of the most important factors to consider in each construction project. In order to maximize performance, both the client and the contractor will work to optimize both the duration of the project and its cost. The fundamental beginning is to support the same production for the different equipment to achieve the maximum efficiency in each period of time. With the limited availability of resources, the work must be continuous and the period of time between operations and final must be kept. This paper aims to minimize the project total time and cost by means of the assignment of equipment of work to the different production lines of the activities. Construction project refers to a high-stake endeavor aiming at time-bound predetermined performance objective. Matching resources are planned and procured so that all activities can be executed according to a prefixed time schedule. Result shows that the optimization of resources is highly dependent on proper planning mechanism and efficient monitoring of its execution. © Springer Nature Singapore Pte Ltd. 2019.
dc.identifier.citationLecture Notes in Civil Engineering, 2019, Vol.25, , p. 167-176
dc.identifier.isbn9789819620951
dc.identifier.isbn9783031951060
dc.identifier.isbn9783031976964
dc.identifier.isbn9783031976889
dc.identifier.isbn9789819679706
dc.identifier.isbn9789819677986
dc.identifier.isbn9783031951145
dc.identifier.isbn9789819685356
dc.identifier.isbn9789819674879
dc.identifier.isbn9789819688333
dc.identifier.issn23662557
dc.identifier.urihttps://doi.org/10.1007/s12190-025-02498-w
dc.identifier.urihttps://idr.nitk.ac.in/handle/123456789/33869
dc.publisherSpringer
dc.subjectMaximum
dc.subjectReal-time correlation study
dc.subjectResource optimization
dc.titleOptimization of resources by real-time correlation study for maximizing the productivity

Files

Collections