Control of grid connected and islanding operations of distributed generation systems with seamless transfer between modes

dc.contributor.authorKrishnan, G.
dc.contributor.authorGaonkar, D.N.
dc.date.accessioned2020-03-30T10:02:30Z
dc.date.available2020-03-30T10:02:30Z
dc.date.issued2013
dc.description.abstractIntentional islanding of distributed generation systems requires seamless transition of power between grid connected and islanding modes, ensuring little or no disruption to the local loads. This paper conducts a detail study regarding the factors affecting seamless transition. A control scheme for grid connected and islanding mode of operation with a passive islanding detection algorithm, synchronization algorithm and recloser algorithm is developed. Simulation studies are carried out to evaluate the performance of the controller in grid connected and islanding modes and the possibility of seamless transition between both modes is verified. � 2013 IEEE.en_US
dc.identifier.citationProceedings of the IEEE International Conference on Control Applications, 2013, Vol., , pp.509-514en_US
dc.identifier.urihttps://idr.nitk.ac.in/handle/123456789/7550
dc.titleControl of grid connected and islanding operations of distributed generation systems with seamless transfer between modesen_US
dc.typeBook chapteren_US

Files