Reliability Analysis of LHD Machine - A Case Study
No Thumbnail Available
Date
2020
Journal Title
Journal ISSN
Volume Title
Publisher
Springer Nature
Abstract
In the present global scenario, survival of the industry is more critical unless it produces their intended targets. Accomplishment of expected rate of production levels are depends on the performance of equipment. Hence, it is very important to predict the maintenance schedules for replacement or repair actions of the defective parts. Keeping in view, every industry is constantly looking for enhancement equipment life. Reliability analysis is one of the well appropriated techniques used to estimate the life of the equipment. In this paper, performance of Load-Haul-Dumper (LHD) has been analyzed. Renewal process approach has been utilized for reliability investigation. Best fit distribution of data sets were made by the utilization of Kolmogorov-Smirnov (K-S) test. Parametric estimation of theoretical probability distributions was done by utilizing Maximum Likelihood Estimate (MLE) method. Reliability of each individual sub-system has been computed according to the best fit distribution. In addition to that, reliability based preventive maintenance (PM) time schedules were calculated for the expected 90% reliability level. The possible recommendations were suggested for improvement of reliability level. © 2020, Springer Nature Switzerland AG.
Description
Keywords
Component, Maintenance, Mining, Reliability, Subsystem
Citation
Learning and Analytics in Intelligent Systems, 2020, Vol.2, , p. 318-326
