Model studies on the efficiency of gravity blind backfilling method and evaluation of a pre-jamming indication parameter
No Thumbnail Available
Date
2016
Authors
Pal, S.K.
Mukhopadhyay, S.K.
Panda, S.
Tripathi, A.K.
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
This paper discusses experimental research on a fully transparent scaled model of a section of a Bord and Pillar mine working carried out to study in detail the effectiveness of hydraulic blind backfilling as a solution to reduce subsidence problem above old underground water-logged coal mines. The relative influence of sand and water flow rates on the areas of filling from a single inlet point has been studied in detail. Automatic data acquisition system was installed in the model to continuously record the sand and water flow rates along with the inlet pressure of slurry at the entrance of the model. Pressure signature graphs have been plotted directly with the help of computer. Pressure signature analyses for various slurry flow rates and sand concentrations have been carried out. Investigation has also been carried out on evaluation of a pre-jamming indication parameter, which could be used for indication of the final stage of filling. 2016 CAFET-INNOVA TECHNICAL SOCIETY. All rights reserved.
Description
Keywords
Citation
International Journal of Earth Sciences and Engineering, 2016, Vol.9, 4, pp.1474-1479