Cost analysis of a two-unit repairable system subject to on-line preventive maintenance and/or repair

dc.contributor.authorGopalan, M.N.
dc.contributor.authorBhanu, K.S.
dc.contributor.authorMurulidhar, N.N.
dc.date.accessioned2020-03-31T08:19:11Z
dc.date.available2020-03-31T08:19:11Z
dc.date.issued1992
dc.description.abstractThis paper deals with the cost analysis of a two-unit repairable system subject to on-line preventive maintenance (on-line PM) and/or repair. The policy adopted here is that the on-line PM work of the operating unit is undertaken first on its completion, the repair work of the failed unit, if any, is subsequently carried out. All the random variables that arise in the analysis are assumed to be independently and arbitrarily distributed. An expression for the expected total cost incurred by the system in a specified time interval is obtained by considering the expected busy period of the server spent on various actions. The analysis is carried out using the regeneration point technique. 1992.en_US
dc.identifier.citationMicroelectronics Reliability, 1992, Vol.32, 12, pp.1675-1679en_US
dc.identifier.urihttps://idr.nitk.ac.in/handle/123456789/10438
dc.titleCost analysis of a two-unit repairable system subject to on-line preventive maintenance and/or repairen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
10438.pdf
Size:
283.63 KB
Format:
Adobe Portable Document Format