Enhancing energy efficiency of auxiliary power system in a 210 MW coal fired power plant through energy efficiency

dc.contributor.authorMandi, R.P.
dc.contributor.authorSeetharamu, S.
dc.contributor.authorYaragatti, U.R.
dc.date.accessioned2026-02-06T06:40:47Z
dc.date.issued2010
dc.description.abstractThis paper describes the results of energy conservation measures in various thermal power plants spread over the country. Energy savings in various major auxiliaries are summarized here with improved performance. Staggering of auxiliary loads, reduction in hydrodynamic resistance of pipes and ducts, adoption of new energy efficient technologies, efficient control techniques, reduction in furnace ingress and monitoring of coal size at mill inlets will lead to substantial amount of energy savings. The energy conservation schemes are economically attractive with a break even period of 1 to 5 years. ©2010 IEEE.
dc.identifier.citation2010 5th International Conference on Industrial and Information Systems, ICIIS 2010, 2010, Vol., , p. 463-468
dc.identifier.urihttps://doi.org/10.1109/ICIINFS.2010.5578660
dc.identifier.urihttps://idr.nitk.ac.in/handle/123456789/33151
dc.subjectAuxiliary power
dc.subjectEnergy conservation
dc.subjectPlant load factor
dc.titleEnhancing energy efficiency of auxiliary power system in a 210 MW coal fired power plant through energy efficiency

Files