Optimization of resources by real-time correlation study for maximizing the productivity

No Thumbnail Available

Date

2019

Authors

Agrawal A.
Das B.B.
Malik S.K.

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

Time and cost are two of the most important factors to consider in each construction project. In order to maximize performance, both the client and the contractor will work to optimize both the duration of the project and its cost. The fundamental beginning is to support the same production for the different equipment to achieve the maximum efficiency in each period of time. With the limited availability of resources, the work must be continuous and the period of time between operations and final must be kept. This paper aims to minimize the project total time and cost by means of the assignment of equipment of work to the different production lines of the activities. Construction project refers to a high-stake endeavor aiming at time-bound predetermined performance objective. Matching resources are planned and procured so that all activities can be executed according to a prefixed time schedule. Result shows that the optimization of resources is highly dependent on proper planning mechanism and efficient monitoring of its execution. © Springer Nature Singapore Pte Ltd. 2019.

Description

Keywords

Citation

Lecture Notes in Civil Engineering, 2019, Vol.25, pp.167-176

Collections

Endorsement

Review

Supplemented By

Referenced By