Optimization of resources by real-time correlation study for maximizing the productivity
No Thumbnail Available
Date
2019
Authors
Agrawal A.
Das B.B.
Malik S.K.
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Time and cost are two of the most important factors to consider in each construction project. In order to maximize performance, both the client and the contractor will work to optimize both the duration of the project and its cost. The fundamental beginning is to support the same production for the different equipment to achieve the maximum efficiency in each period of time. With the limited availability of resources, the work must be continuous and the period of time between operations and final must be kept. This paper aims to minimize the project total time and cost by means of the assignment of equipment of work to the different production lines of the activities. Construction project refers to a high-stake endeavor aiming at time-bound predetermined performance objective. Matching resources are planned and procured so that all activities can be executed according to a prefixed time schedule. Result shows that the optimization of resources is highly dependent on proper planning mechanism and efficient monitoring of its execution. © Springer Nature Singapore Pte Ltd. 2019.
Description
Keywords
Citation
Lecture Notes in Civil Engineering, 2019, Vol.25, pp.167-176