Faculty Publications
Permanent URI for this communityhttps://idr.nitk.ac.in/handle/123456789/18736
Publications by NITK Faculty
Browse
2 results
Search Results
Item Assigning weights for modified project Quarter Back Rating based construction project performance model(International Journal of Mathematical, Engineering and Management Sciences, 2019) Ingle, P.V.; Mahesh, G.The Indian construction industry is facing challenges due to performance shortfalls. The construction projects are highly complex, distinctive, fragmented and do not have of well-established performance assessment models to evaluate their project success. Assessing overall project success is not possible to measure by single factor. To address this limitation, the Modified Project Quarter Back Rating (PQR) model was developed for the Indian construction industry. Modified PQR model's output is a project score based on performance areas affecting project success and outcome. The model integrates ten performance areas that have identified through literature review. Performance areas included in the model are; (i) Cost (ii) Schedule (iii) Stakeholder satisfaction (iv) Safety (v) Quality (vi) Finance (vii) Environment (viii) Communication and collaboration (ix) Customer relation and (x) Productivity. These performance areas are measured through different performance metrics; i.e. performance metrics scores are aggregated to compute performance area scores. The model gives a single score that will help in comparing overall performance for different projects. This paper attempted to highlight the importance of performance metrics in modified Project Quarter Back Rating (PQR) based construction project performance assessment model for the Indian construction industry. The validity of the model needs assigning appropriate weights to the performance metrics as the weightage determines the relevance. Appropriate weights were determined using two round Delphi survey with 12 experts. Findings reveal that two performance metrics; return business from customer relation and OSHA recordable from safety have high weights. This modified PQR model will help key participants of the industry to compare the performance of various projects and to monitor performance areas that impact project performance rating. © International Journal of Mathematical, Engineering and Management Sciences.Item Exploring performance areas and developing performance assessment model for a construction projects in India(Emerald Publishing, 2024) Ingle, P.V.; Mahesh, G.Purpose: The success of construction projects can be indicated by measuring their performance. For effective project performance (PP), the successful execution of a construction projects is very important. A systematic review of the literature on performance areas and performance assessment models was undertaken. The purpose of this paper is to develop a mathematical formulation for construction PP areas to suit the Indian context by modifying the current project quarterback rating (PQR) model. Design/methodology/approach: Based on the literature, the PQR model has not been validated for suitability in the Indian context. To validate the PQR model and modify the same for the Indian context, a survey instrument was used to collect data on performance areas and a multivariate data analysis technique was carried out to develop a modified model. Delphi technique was used to assign the weights for each performance metric in performance areas. Findings: This study concluded the importance of three additional performance areas, namely, productivity, stakeholder satisfaction and environment for assessing PP for Indian construction projects. It also identified the interrelationship between the performance areas and the PP. Practical implications: The developed modified PQR model (MPQR) will guide the concerned stakeholders to take corrective actions for improving the performance of construction projects. Originality/value: The MPQR proposed in this paper covers ten areas and is a comprehensive single score that can be used to benchmark and compare performance over different projects to achieve continuous improvement. © 2022, Emerald Publishing Limited.
